top of page
5.jpg

Bwanje Valley Dam

Stretching over the Bwanje Valley in the Dedza district, the Bwanje Irrigation Scheme was constructed to connect and provide irrigation to over 800 hectares, during the dry season. 

​

This dam stretches across 150m and stands at 45m in height.

​

Client: Ministry of Agriculture, Irrigation and Water Supply, Malawi. (Funded by the European Union). 

 

Completed in 2019.

1.jpg

Chapananga Bridge

The longest bridge in Malawi to date, Chapananga Bridge, was built to connect the people of  Chimwanjale and Chibisa, and provide a shortcut to Mwanza and Mozambique from Chikwawa.

 

This bridge stands at 180 metres.

 

Client: Ministry of Transport and Public Works.

 

Completed in

Hest night.jpg

Polytechnic

Client: 

2.jpg

Nkhata Bay District Hospital

Client:

3.jpg

Mzuzu Water Supply

Client:

© 2021 by Plem Construction Ltd. 

bottom of page